Hi Chad
I have been puzzling about how best to convert some of the homework charts, which are mainly intraday in nature, to longer timeframes. To give a practical example, if I wanted to look at the first DAY OF THE WEEK as the IB, and the rest of the week used to base IB break etc stats off how would one best do this using what is already built? Or the first week of the month defines the IB etc.
Basically is it possible to take these concepts and apply to higher timeframes (Weekly pivots versus daily, longer timeframe IBs etc)
Darren,
Point me to the specific study you are looking to convert and I'll take a look. But in general, you would switch the chart to "Time Per Bar: Weekly" and then to grab the IBH for instance from within those weekly bars, you'd use MPD in this way...